Ganzen E.V.

Applicant, National Research Moscow State University of Civil Engineering, Russia

RESEARCH OF THE RESPONSE SURFACE OF THE INTEGRAL POTENTIAL OF CAPITAL REPAIRS AND RECONSTRUCTION OF PUBLIC BUILDINGS IN THE FUZZY INFERENCE SYSTEM

https://doi.org/10.58224/2618-7183-2022-5-2-35-42
Abstract
It is proposed to use fuzzy production rules when making decisions on inclusion in the title list of public buildings, since in the practice of assessing the technical condition of a building on the basis of an expert opinion based on the results of a survey, the duration of operation determined in accordance with regulatory values, deadlines for work and other indicators affecting the integral potential of including a building in the capital repair and reconstruction plan, such fuzzy concepts as "satisfactory", "unsatisfactory" and others appear. The article proposes the use of the original fuzzy inference methodica to assess the need for major repairs and reconstruction based on the potential of organizational-technological solutions and analyzes the response surfaces, that is, the values of the integral potential depending on expert assessments of input factors.
PDF